METAL MOLD ENCAPSULATION

In order to contain pressures above 25 psi, it is necessary to use a metal mold. PLCS designs these on our CAD system. They are usually custom fabricated from steel in two halves, which are bolted together on the pipe. The sealant is mixed and poured into the mold. The mold is capped and then pressurized with bottled nitrogen to above mains pressure. A gauge registers the sealant pressure. The nitrogen pressure is left on for 24 hours and then the mold is removed. The steel mold belongs to the customer and is reusable many times. With a little care it will last many years. The whole operation is very simple and easy to learn by your own employees. Field technicians are available for on-site instruction and supervision.

Home

More Info

leak repair for cast iron gas mains | pe pipe products | tapping equipment | internal joint pipe repair | natural gas flow stopping | additional products
Home | your PLCS contacts | PLCS history | www.plcunderground.com

PLCS Inc. 102 Gaither Drive, Unit 1, Mount Laurel, NJ. 08054 USA Tel. 856-722-1333 Fax. 856-273-9723


Site design by The Netmark.com Tel. 888-767-8750