|
- Automatic electronic monitoring equipment built into the spray head precisely locates the joints and directs the sprayed anaerobic sealant.
- Sprayed sealant wicks up into the joint cavity, closing off leak paths and sealing the leak.
- The sealant is delivered in controlled quantities to each joint and any excess sealant fully cures in the main within 72 hours.
- The system works equally well on Low Pressure or Medium Pressure mains
|